Skip to main content
ЦЕЕ

Single window

A result, not advice and a folder of documents

We see it through to the end — ourselves or with partner contractors, while the expert, technical and technological role stays with the Center. You deal with a single window: survey, calculation, design, procurement, implementation and result verification — inside one circuit of responsibility.

How it works

One circuit instead of five contractors

An energy project is usually torn between different contractors: one surveys, another calculates, a third designs, a fourth installs — and none of them answers for the final result. The Center pulls this into a single circuit.

  • One point of responsibility

    You talk to the Center, not to five contractors. Coordinating the stages is our job, not yours.

  • The expertise stays with the Center

    Where hands are needed, we bring in partner contractors. The expert, technical and technological role stays with us: we set the requirements, control execution and sign off the work.

  • We close with a result

    A project ends not with a folder handed over, but with a working system whose effect is confirmed by metering data.

Ways of working

How deep we go

By default we carry a project through to the result. But if you only need an idea checked or a single stage covered — that's a normal way in too.

  1. One-off consultation or expert opinion

    For a quick check of an idea, a risk or a specific decision.

  2. Retainer

    For regular monitoring, analytics, procurement or regulatory support.

  3. Project support

    For a specific stage: audit, feasibility study, specification, grant, procurement, connection or financial model.

  4. Turnkey project

    Main format

    From the first survey to a working system. Complex energy, investment and infrastructure projects requiring cross-disciplinary coordination and partner contractors.

  5. Strategic partnership or consortium

    For long development programmes, building a project portfolio and joint participation in grant or investment initiatives.

What the work consists of

Sixteen blocks

These are stages inside a turnkey project and stand-alone expert products. Each can be taken separately if the rest is covered — but by default we do not stop at any of them.

  • Energy Diagnostic Start

    Quickly understand where losses are and where to start

    What this stage produces

    • Short energy profile
    • List of problems
    • Quick measures
    • Savings roadmap
  • Procurement Office Light

    Prepare a procurement without errors or delays

    What this stage produces

    • Procurement plan
    • Technical specification
    • Market analysis
    • Document package
    • Deadline control
  • Grant Ready / Donor Ready

    Turn an idea into a submission-ready package

    What this stage produces

    • Project concept
    • Budget
    • Impact logic
    • Full donor material set
  • Feasibility Study Ready

    Obtain a document for a decision and for financing

    What this stage produces

    • Feasibility study
    • Financial model
    • Risks
    • Scenarios
  • DSO Connection Ready

    Reduce the risks of grid connection and DSO interaction

    What this stage produces

    • DSO interaction package
    • Technical conditions analysis
    • Connection risks
    • Action plan
  • BESS Ready

    Test whether BESS makes economic sense and prepare the next step

    What this stage produces

    • Preliminary feasibility
    • Operating modes
    • Payback scenarios
    • Specification for the next stage
  • Energy Manager Outsource

    Get systematic consumption management without building a large in-house team

    What this stage produces

    • Monthly consumption control
    • Reporting
    • Savings measures
    • Project portfolio
  • HIOS Monitor

    Maintain continuous monitoring of grants, tenders and regulation

    What this stage produces

    • Digests
    • Templates
    • Trackers
    • Analytics
    • Fast access to information
  • ESCO contract and energy management

    Pay for modernisation from savings, not from the budget

    What this stage produces

    • 3-year consumption baseline
    • 80/20 contract terms and three scenarios
    • Energy management system under ISO 50001
    • Savings verification under IPMVP
    • Prozorro tender package
  • Building energy certification

    Obtain the certificate and a thermal-modernisation plan required by law

    What this stage produces

    • Energy performance calculation (class A+–F)
    • Building energy certificate
    • Thermal-modernisation recommendations
    • Compliance with Law 2118-VIII, DBN V.2.6-31, DSTU 9190
  • Regulatory monitoring and compliance

    Never miss a rule change that affects your site or project

    What this stage produces

    • Monitoring of NEURC, Parliament, Cabinet, ENTSO-E
    • Project compliance check against the codes
    • Monthly review with a 'what it means for you' conclusion
    • Position for appeals to the DSO and the regulator
  • Water supply and sewerage audit

    Understand the real cost and losses of a water utility before decisions

    What this stage produces

    • Express audit (30 days) or full (2–3 months)
    • Cost model based on the GIZ methodology with author's coefficients
    • Terms of reference and commercial proposal
    • Express report with priorities
  • Tariffs: calculation, revision, justification

    Submit a justified tariff for heat, hot water, water or sewerage

    What this stage produces

    • Tariff structure and cost check
    • Calculation and revision scenarios
    • Compensation of tariff difference
    • Package for NEURC or the local council
    • Term: about 20 working days
  • Turnkey storage and solar integration

    Go from survey to commissioning of storage or PV without gaps between stages

    What this stage produces

    • Survey and effect model
    • Design ToR under DBN A.2.2-3
    • Procurement and contractor organisation
    • Technical supervision and acceptance
    • Commissioning
  • Dashboards and data automation

    See consumption and the effect of measures in real time, not once a year

    What this stage produces

    • Data collection from AMR, meters, SCADA, APIs
    • KPI/EnPI indicators under ISO 50006
    • Interactive panels for the manager and energy manager
    • Hosted on site or on the client's website
  • Training and documentation

    Hand knowledge to the team and give management clear reports

    What this stage produces

    • Technical reports and analytical notes
    • Presentations for HOA boards, community councils, investors
    • Training of energy managers and responsible staff
    • Templates and instructions for daily work

Cost and timelines are set by scope after an initial conversation. There is no standard price list: scope depends on the state of the site, the data available and how deep we go.

Where should you start?

Describe the site and the task — we'll tell you what's needed at the start and what the path to the result looks like.

Get a consultation